Transport of a hugh crane to the harbour

For Fagioli Kuldipsingh has transported all parts (counterweights, boom sections, carbody, etc.) of a huge crane (capacity 500 tons) from port Paranam Smalkalden to Staatsolie Tout Li Faut.

In “De Nieuwe Haven” Kuldipsingh has assisted in unloading the first 10 OS / OW units for the REP project, using its GMK4100 (100 tons) crane. It was a tough job because all components are OS / OW (oversized and overweight!).

This was only the first part of the operation. Later on the parts will be moved from the dock onto the pontoons by multiaxale trailers, and then transported to their final destination at Staatsolie.